Kuma

SBB CFF FFS

Year of manufacture

2015 - 2020

Kummler+Matter Services

Project engineering and installation

Route length

-

Short description

The new Bözberg tunnel was rebuilt between the Effingen railway station and Schinznach village locations. Kummler+Matter was responsible for the open air installations on both sides of the tunnel, as subcontractor to Furrer + Frey AG. This mandate comprised the entire renewal of the overhead lines and routing into the new tunnel.