Zentralbahn
Year of manufacture
2019
Kummler+Matter Services
Complete dismantling and installation of the catenary for a three-track station
Route length
-
Short description
In a concentrated construction process, the entire catenary for the station was dismantled and then rebuilt in three phases. It was also necessary to ensure that the tracks were navigable again every morning. The Horw support structure was also entirely rebuilt and renewed.