Basler Verkehrs-Betriebe (BVB)
Year of manufacture
2014 - 2018
Kummler+Matter Services
Planning, material, erection of masts and installation of the catenary
Route length
720 m
Short description
Following the replacement of 720 m of track, the entire catenary system, two feeders and a jumper required renewal under full closure. A total of five new catenary poles were placed and two new wall bolts were relocated.