Kuma

Verkehrsbetriebe Zürich (VBZ)

Year of manufacture

2017 - 2018

Kummler+Matter Services

Planning, material and installation of the catenary

Route length

-

Short description

Both islands (Hegibachplatz and Klusplatz) had to be rebuilt due to the rerouting of a trolleybus line. Parts of the old system were dismantled and optimised during the project. A total of six new trolleybus / tram crossings, three new trolleybus / trolleybus crossings and two new trolleybus switches (600V DC) were constructed.