Verkehrsbetriebe Zürich (VBZ)
Year of manufacture
2011 - 2018
Kummler+Matter Services
Planning, material and installation of the catenary
Route length
2,8 km
Short description
The entire catenary system in Usteristrasse and Löwenstrasse was refurbished. On this section, a two-track tram line (including feeder) and a trolleybus line (outbound and inbound) were installed on the same support structures (total of eight contact wires on each support structure). The project also included three trolleybus / tram crossings and six tram / tram crossings under 600V DC.