SBB CFF FFS
Year of manufacture
2015 - 2020
Kummler+Matter Services
Project engineering and installation
Route length
-
Short description
The new Bözberg tunnel was rebuilt between the Effingen railway station and Schinznach village locations. Kummler+Matter was responsible for the open air installations on both sides of the tunnel, as subcontractor to Furrer + Frey AG. This mandate comprised the entire renewal of the overhead lines and routing into the new tunnel.