Alp Transit Gotthard AG

Year of manufacture

2008 - 2016

Kummler+Matter Services

Planning, system design, approval, material and assembly

Route length

57 km double track in the tunnel and 39 km catenary open lines

Short description

Innovative and high quality Catenary Solutions for the longest rail tunnel in the world, Catenary system for 57 km double track as well as 39 km overhead system with open track; 15kV / AC; 250km/h.

GOTTHARD BASE TUNNEL

Installing the traction current plant was a complex process. It involved twelve operations, from the measuring of the support bases to the installation of the traction power supply. Each operation was completed separately. The overhead contact line, a catenary system Type Re250 GBT, consists of the catenary (contact wire and supporting cable) with four parallel feeders for the tunnel section.

The overhead contact line developed specially for the Gotthard Base Tunnel offers the ideal solution for the power supply of heavy freight trains and the navigability of passenger trains travelling up to 250 km/h. The individual components were assembled in several operational steps to make the entire system, from setting the anchor rods to installing the power connections.