Kuma

Verkehrsbetriebe Zürich (VBZ)

Year of manufacture

2017

Kummler+Matter Services

Planning, material and installation of the catenary

Route length

Tram 600 m Trolleybus 400 m

Short description

The entire catenary system at Central Platz was renewed while operation continued. It consisted of 20 tram / tram crossings and 9 trolleybus / tram crossings. Various provisional structures were required during the construction of the new system (600V DC). It was also necessary to cooperate closely with other contractors. Five tram lines and one trolleybus line service Central Platz.