Kuma

Verkehrsbetriebe Zürich (VBZ)

Year of manufacture

2011 - 2018

Kummler+Matter Services

Planning, material and installation of the catenary

Route length

2,8 km

Short description

The entire catenary system in Usteristrasse and Löwenstrasse was refurbished. On this section, a two-track tram line (including feeder) and a trolleybus line (outbound and inbound) were installed on the same support structures (total of eight contact wires on each support structure). The project also included three trolleybus / tram crossings and six tram / tram crossings under 600V DC.