Kummler+Matter Services

Dismantling of a single-track system and construction of a dual-track system

Route length

1,4 km

Short description

During a two-week shutdown period, 1.4 km of single track at a stop was completely dismantled. Following reconstruction of the superstructure, Kummler+Matter rebuilt the dual-track catenary. The poles were placed by helicopter during the rebuilding phase.